This version of the construction of the building also attracts a small period of building a building. In a couple of weeks, it is realistic to build a full -fledged object, and after the end of the finishing process, proceed to complete operation. Fertile soil layers located in the area of arrangement of the fundamental structure are completely removed. Instead of this earth, sand is covered, which has excellent drainage qualities.
For the construction of the basement in the fundamental base, there are exhalations, after which from 9 to 18 holes are drilled. They are needed to install anchor bolts. After the end of the preparatory process, the surface of the fundamental structure is treated with a waterproofing solution. Hydrostecloisol and film are laid on the base so that humidity does not fall into the area of the basement laid out during further work from brick. Materials for work can be purchased on the Internet. It is also possible to buy other useful items there. Tour tower, for example, will significantly facilitate this work. And it is cheap.
Work on the installation of a basement is carried out on the principle of “platform”. A 50 × 15 cm boat is laid on the strip base of 50. Two timber are attached to brick columns. To fix the wood elements, studs are used, which were initially mounted for this purpose. To improve the stiffness of the frame of the basement, you need to mount two more timber in the building center. Thanks to this decision, the level of the binding height will be 15 cm.